Venue: Ashcombe Suite, County Hall, Kingston upon Thames, Surrey KT1 2DN
Contact: Vicky Hibbert or Anne Gowing 020 8541 9938 Email: anne.gowing@surreycc.gov.uk
No. | Item |
---|---|
APOLOGIES FOR ABSENCE
Additional documents: Minutes: Apologies were received from Mrs Curran. |
|
MINUTES OF PREVIOUS MEETING: 29 July 2015
The minutes will be available in the meeting room half an hour before the start of the meeting. Additional documents: Minutes: The minutes of the meeting held on 29 July 2015 were confirmed and signed by the Chairman.
|
|
DECLARATIONS OF INTEREST
To receive any declarations of disclosable pecuniary interests from Members in respect of any item to be considered at the meeting.
Notes: · In line with the Relevant Authorities (Disclosable Pecuniary Interests) Regulations 2012, declarations may relate to the interest of the member, or the member’s spouse or civil partner, or a person with whom the member is living as husband or wife, or a person with whom the member is living as if they were civil partners and the member is aware they have the interest. · Members need only disclose interests not currently listed on the Register of Disclosable Pecuniary Interests. · Members must notify the Monitoring Officer of any interests disclosed at the meeting so they may be added to the Register. · Members are reminded that they must not participate in any item where they have a disclosable pecuniary interest. Additional documents: Minutes: There were none. |
|
PROCEDURAL MATTERS
Additional documents: |
|
Members' Questions
The deadline for Member’s questions is 12pm four working days before the meeting (16 September 2015).
Additional documents: Decision: A question from Mr Barker was received. The question and response was attached as Appendix 1.
Minutes: A question from Mr Barker was received. The question and response was attached as Appendix 1.
|
|
Public Questions
The deadline for public questions is seven days before the meeting (15 September 2015).
Additional documents: Minutes: No public questions were received. |
|
Petitions
The deadline for petitions was 14 days before the meeting, and no petitions have been received.
Additional documents: Minutes: No petitions were received.
|
|
Representations received on reports to be considered in private
To consider any representations received in relation why part of the meeting relating to a report circulated in Part 2 of the agenda should be open to the public. Additional documents: Minutes: No representations were received.
|
|
(i) Social Care Services Board regarding Deprivation of Liberty Safeguards (DOLS) Additional documents: Decision: Social Care Services Board – recommendations relating to Deprivation of Liberty Safeguards (DOLS) were received. The response from the Cabinet Member for Adult Social Care, Wellbeing and Independence is attached as Appendix 2. Minutes: Social Care Services Board – recommendations relating to Deprivation of Liberty Safeguards (DOLS) were received. The response from the Cabinet Member for Adult Social Care, Wellbeing and Independence is attached as Appendix 2. |
|
Finance and Budget Monitoring Report for July and August 2015 PDF 137 KB
The council takes a multiyear approach to its budget planning and monitoring, recognising the two are inextricably linked. This report presents the council’s financial position as at 31 August 2015 (month five). The Annex to this report gives details of the financial position but please note that the Annex will be circulated separately prior to the Cabinet meeting.
[The decision on this item may be called in by the Council Overview Board] Additional documents: Decision: That the report be noted, including the following:
1. That as at 31 August 2015, services forecast a £3.4m revenue budget variance as at year end, as set out in paragraph1 of the submitted Annex. 2. That service managers be required to confirm actions that will achieve a balanced budget. 3. That services forecast efficiencies and service reductions for 2015/16 at £66.3m, as set out in paragraph 24 of the submitted Annex. 4. That the total forecast capital expenditure, including long term investments be £188.4m, as set out in paragraph 34 of the submitted Annex. 5. That a virement of £930,000 to reflect expenditure and income in relation to the DCLG Troubled Families Programme, as set out in paragraph 3 of the submitted Annex be approved.
Reasons for Decisions:
This report is presented to comply with the agreed policy of providing a monthly budget monitoring report to Cabinet for approval and action as necessary.
[The decision on this item may be called in by the Council Overview Board]
Minutes: The Leader of the Council presented the third budget monitoring report for the 2015/16 financial year, covering the period up to 31 August 2015 and including changes in the months of July and August. He drew attention to Table 1 which set out the current budget, including all approved adjustments and said that the impact of these changes was that the Council would still need to draw £3.7m from the Budget Equalisation Reserve. Referring to Table 3 – the 2015/16 Revenue Budget which set out the budgetary performance by service, he said that the majority of services had no significant variance. He also confirmed that the Council’s financial strategy remained, as he had previously stated, and had four key drivers to ensure sound governance in managing finances and providing value for money. These were: 1. To keep any additional call on the council taxpayer to a minimum Current forecast for the end of year revenue position was for an overspend of +£3.4m. However, Cabinet had a strong commitment to financial management and the second recommendation was to require service managers to confirm actions to manage an overall balanced budget, which he was confident, with Cabinet’s support for managers’ actions would make this the sixth consecutive year that the Budget had a small underspend or balanced outturn across the Council.
He said that the Council’s multi-year approach to financial management aimed to smooth resource fluctuations over five years and managing budgets to achieve a small underspend was important for giving the Council some headroom and flexibility for managing spending plans for future years. 2. To continuously drive the efficiency agenda That, at the end of August, services forecast delivering efficiencies at their target level of £66.3m. Of this, £30m had either already been implemented or were on track, £13m had some issues, £19m were additional in year or one off savings and of a total of £66.3m, £4m were considered to be at risk. 3. To reduce the Council’s reliance on council tax and government grant income. That reducing reliance on government grants and council tax was key to balancing the Council’s budgets over the longer term and the Revolving Infrastructure and Investment Fund had invested £2.5m so far this year and forecast investing £19m by the year end. 4. To continue to maximise our investment in Surrey Finally, he said that the Council’s £696m capital programme for 2015-20, not only improved and maintained services, it was also a way of investing in Surrey and generating income for the council, with forecast investment of £188m in 2015/16.
Other Cabinet Members were invited to highlight the key points and issues from their portfolios, as set out in the Annex to the report.
RESOLVED:
That the report be noted, including the following:
1. That as at 31 August 2015, services forecast a £3.4m revenue budget variance as at year end, as set out in paragraph1 of the submitted Annex. 2. That service managers be required to confirm actions that will achieve a balanced ... view the full minutes text for item 175/15 |
|
Highways Cold Weather Plan for 2015/16 PDF 169 KB
The winter maintenance service is provided by Surrey County Council (SCC) to enable the residents of surrey to carry out their everyday activities during periods of winter weather. Preventing icy roads and keeping priority roads and footways usable during snowy conditions contributes to the corporate goals by keeping residents safe as they travel about and maintaining the availability of key routes so residents have choices on travel and the impact on the economy of severe weather is minimised. The winter maintenance service is part of a collection of highway maintenance activities, including other severe weather strategies, that keep the road and footway network operational for residents all year round.
The Winter Service is delivered in two distinct operations:
1. Pre-treatment of Routes and Advance Planning – this ensures that pre-defined route networks including carriageways, cycleways and areas of footway, are pre-treated according to their importance and the weather conditions, to inhibit the formation of ice and facilitate the removal of snow.
2. Management of Severe Snow Event – this ensures the service is prepared to manage a severe snow event, to reduce disruption and improve safety.
In 2010 a joint officer and member Winter Performance Task Group was formed to review the overall delivery of the winter service. The successes of the Task Group and the principles that it has developed inform annual winter reviews to deliver continuous improvement to the service.
This report provides an overview of the performance of winter service last year and recommendations to further improve the service.
[The decision on this item may be called in by the Economic Prosperity, Environment and Highways Board] Additional documents: Decision: 1. That the Highways Cold Weather Plan for the forthcoming 2015/16 season, attached as Annex 1 to the submitted report, be approved.
2. That the Economic Prosperity, Environment and Highways Board Winter Performance Task Group recommendations, as detailed within paragraph 3 of the submitted report, be noted.
Reasons for Decisions:
To agree the Highways Cold Weather Plan for the coming winter season.
[The decision on this item may be called in by the Economic Prosperity, Environment and Highways Board]
Minutes: The Cabinet Member for Highways, Transport and Flooding began the introduction of this report by thanking the Economic Prosperity, Environment and Highways Scrutiny Board’s winter performance task group for their excellent and helpful work.
He said that the Winter Service was delivered in two distinct operations:
1. Pre-treatment of Routes and Advance Planning – this ensured that pre-defined route networks including carriageways, cycleways and areas of footway, were pre-treated according to their importance and the weather conditions, to inhibit the formation of ice and facilitate the removal of snow.
2. Management of Severe Snow Event – this ensured the service was prepared to manage a severe snow event, to reduce disruption and improve safety.
He referred to the Surrey Priority Network (SPN) and the changes which would allow for more informed network discussions in the future and also that the footway priority snow clearing schedules had been updated and aligned with the new SPN maintenance hierarchy.
He said that the County Council was indebted to the 52 farmers who were under agreement to Surrey Highways Service to carry out snow clearance on certain minor roads and considered this was extremely helpful and had received strong resident support.
He also said that partnership working was key to the successful operation of the Winter Service Plan and that the County Council worked closely with Boroughs and Districts. He also referred to the Residents Communication Plan and the on-going publicity campaigns and said that the needs of all highway users, including those that were vulnerable were considered when making decisions on service provision, as detailed within paragraphs 34 – 36 of the report.
Cabinet considered that this was a good report and discussed different ways of communicating winter service information, including twitter, which was considered very effective in providing real-time information.
They also requested that the Plan was widely distributed to Borough, District and Parish Councils so that communities were aware of the arrangements made for dealing with a ‘big snow event’ and also the importance of identifying vulnerable people in their local communities.
The Cabinet Member for Environment and Planning considered that grit bins should be re-filled, if resources allowed, during the winter.
The Cabinet Member for Business Services and Resident Experience requested a copy of a map showing the location of the grit bins in her division, which the Cabinet Member for Highways, Transport and Flooding agreed to provide for her and other Members on request.
Finally, the Leader of the Council drew Cabinet’s attention to paragraph 37 of the report – Legal Implications, and requested that they ensured that they were aware of the legal duty of a local authority.
He also requested that a press release was prepared which explained the difference between different salting methods (dry and wet salt) and the benefits of using the ‘pre-wet’ salt used on Surrey roads.
RESOLVED:
1. That the Highways Cold Weather Plan for the forthcoming 2015/16 season, attached as Annex 1 to the submitted report, be approved.
2. That the ... view the full minutes text for item 176/15 |
|
Investment in improvements to the Visitor Facilities at Newlands Corner
This item has been withdrawn. Additional documents: Decision: This item has been withdrawn. Minutes: This item has been withdrawn. |
|
To approve the Business Case for the provision of a multi use games area as phase 1 of the expansion of Reigate Parish Church Infant School from a 2 Form of Entry infant (180 places) to a 2 Form of Entry primary (420 places) creating 240 additional places in Reigate, to help meet the basic need requirements in the Reigate area from September 2016.
N.B. An annex containing exempt information is contained in Part 2 of the agenda – item 13.
[The decisions on this item can be called in by either the Council Overview Board or the Education & Skills Board]
Additional documents: Decision: That, subject to the agreement of the detailed financial information for the expansion set out in Part 2 of this agenda (item 13), the business case for the provision of a multi use games area (MUGA) as phase 1 of an additional 2 Form of Entry (240 places) junior places in Reigate be approved.
Reasons for Decisions:
The proposal supports the Authority’s statutory obligation to provide sufficient school places, relative to demand.
[The decisions on this item can be called in by either the Council Overview Board or the Education & Skills Board]
Minutes: The Cabinet Member for Schools, Skills and Educational Achievement requested Cabinet’s support for the approval of the business case for the provision of a Multi-Use Games Area (MUGA) as phase 1 of the expansion of Reigate Parish Church Infant School. The proposal was to expand this school from a 2 Form of Entry infant (180 places) to a 2 Form of Entry primary (420 places) creating 240 additional places in Reigate, to help meet the basic need requirements in the Reigate area from September 2016. She said that births in the Borough in 2013 were 21.1% higher than births in 2005.
She drew attention to the school place provision in the Reigate Planning Area and said that there was a shortage of junior provision in this area which this proposed expansion would help to address.
She also said that the expansion at this school would be in two phases: Phase 1 – the provision of a MUGA, which was necessary to provide in advance of the phase 2 because play space would be very restricted during the phase 2 construction works. Phase 2 would be a new 2-storey building providing 8 classrooms, staff and pupil toilets, new hall, staffroom, library and IT room and the subject of a separate report in the future.
Finally, she referred to the consultation process, as detailed in the report and confirmed that the Governing Body of the school had voted to proceed with the school expansion, had formally notified the Local Authority on 14 July 2015 and that she had taken an individual Cabinet Member decision to expand this school on 10 September 2015. She commended the recommendations to Cabinet.
RESOLVED:
That, subject to the agreement of the detailed financial information for the expansion set out in Part 2 of this agenda (item 13), the business case for the provision of a multi use games area (MUGA) as phase 1 of an additional 2 Form of Entry (240 places) junior places in Reigate be approved.
Reasons for Decisions:
The proposal supports the Authority’s statutory obligation to provide sufficient school places, relative to demand. |
|
Award of Contract for the Managed Service for Temporary Agency Resources PDF 217 KB
This report seeks approval to award a contract to Adecco UK & Ireland for a Managed Service for the provision of temporary labour resources to commence on 1 February 2016 as the current arrangements expire on 31 January 2016.
This report provides details of the procurement process, including the results of the evaluation process and, in conjunction with the Part 2 report, demonstrates why the recommended contract award delivers best value for money.
[Note: Due to the commercial sensitivity involved in the contract award process the financial details of the successful supplier have been circulated as a Part 2 report - item 14.]
[The decision on this item may be called in by the Council Overview Board]
Additional documents: Decision: 1. That the contract be awarded to Adecco UK & Ireland. 2. That the contract be awarded for an initial period of four years, with an option to extend for up to two further years. Reasons for Decisions:
During a review of the spend and contracts with the Corporate and Human Resources categories in both Surrey and East Sussex Councils, procurement identified an opportunity to align the expiry of the current contracts and retender as a joint contract to appoint a single provider for both Councils.
Following an assessment of a number of options it was decided that a mini competition process using the “Eastern Shires Purchasing (ESPO) Managed Services for Temporary Agency Resource Framework (ref 653F)” was deemed the most appropriate route to market.
The tender was in compliance with the requirements of Public Contracts Regulations 2006 and the Council’s Procurement Standing Order. The recommendation provides best value for money for this contract in following a thorough evaluation process.
This procurement exercise has been carried out in collaboration with East Sussex County Council to secure a single provider to deliver the service for both Councils via an individual contract for each Council.
In accordance with their constitution and procurement standing orders, East Sussex County Council have already awarded their contract to Adecco UK & Ireland.
[The decisions on this item can be called in by the Council Overview Board]
Minutes: Introducing this report, the Cabinet Member for Business Services and Resident Experience said that it sought approval to award a contract to Adecco UK & Ireland for a Managed Service for the provision of temporary labour resources to commence on 1 February 2016 because the current arrangements expired on 31 January 2016. This new contract would be awarded for an initial period of four years.
She said that the Council spent £12m per annum on the supply of temporary resources to help both frontline and back-office functions deliver their services effectively. She highlighted the Procurement Strategy and options, as set out in paragraphs 14 – 19 of the report and also drew attention to typos: the bullet points in paragraph 15 should have been points (a) – (d) and in paragraph 16, it should have said that the tender process described in paragraph 15(c), and not 10(c), was chosen.
She also said that there would be a 16 week mobilisation period to ensure that the system was configured, staff were trained and processes, infrastructure and support agencies were fully in place before the new contract went live. The performance would also be monitored using a Service Level Agreement and Key Performance Indicators and the contract would also utilise local and small and medium sized enterprises.
Finally, she said that the need for an Equalities Impact Assessment had been considered. However, it was not required because there were no implications for any public sector equalities duties due to the nature of services being procured but she did state that as part of delivery of this contract all workers assigned to work or have exposure to vulnerable adults and children would be subject to an enhanced DBS check.
RESOLVED:
1. That the contract be awarded to Adecco UK & Ireland. 2. That the contract be awarded for an initial period of four years, with an option to extend for up to two further years. Reasons for Decisions:
During a review of the spend and contracts with the Corporate and Human Resources categories in both Surrey and East Sussex Councils, procurement identified an opportunity to align the expiry of the current contracts and retender as a joint contract to appoint a single provider for both Councils.
Following an assessment of a number of options it was decided that a mini competition process using the “Eastern Shires Purchasing (ESPO) Managed Services for Temporary Agency Resource Framework (ref 653F)” was deemed the most appropriate route to market.
The tender was in compliance with the requirements of Public Contracts Regulations 2006 and the Council’s Procurement Standing Order. The recommendation provides best value for money for this contract in following a thorough evaluation process.
This procurement exercise has been carried out in collaboration with East Sussex County Council to secure a single provider to deliver the service for both Councils via an individual contract for each Council.
In accordance with their constitution and procurement standing orders, East Sussex County Council have already awarded their contract to Adecco UK ... view the full minutes text for item 179/15 |
|
LEADER / DEPUTY LEADER / CABINET MEMBER DECISIONS TAKEN SINCE THE LAST CABINET MEETING PDF 94 KB
To note any delegated decisions taken by the Leader, Deputy Leader and Cabinet Members since the last meeting of the Cabinet. Additional documents: Decision: That the decisions taken by Cabinet Members since the last meeting, as set out in Annex 1 of the submitted report, be noted.
Reasons for Decisions:
To inform the Cabinet of decisions taken by Cabinet Members under delegated authority.
Minutes: RESOLVED:
That the decisions taken by Cabinet Members since the last meeting, as set out in Annex 1 of the submitted report, be noted.
Reasons for Decisions:
To inform the Cabinet of decisions taken by Cabinet Members under delegated authority.
|
|
EXCLUSION OF THE PUBLIC
That under Section 100(A) of the Local Government Act 1972, the public be excluded from the meeting during consideration of the following items of business on the grounds that they involve the likely disclosure of exempt information under the relevant paragraphs of Part 1 of Schedule 12A of the Act. Additional documents: Decision: RESOLVED that under Section 100(A) of the Local Government Act 1972, the public be excluded from the meeting during consideration of the following items of business on the grounds that they involve the likely disclosure of exempt information under paragraph 3 of Part 1 of Schedule 12A of the Act.
PART TWO – IN PRIVATE
THE FOLLOWING ITEMS OF BUSINESS WERE CONSIDERED IN PRIVATE BY THE CABINET. SET OUT BELOW IS A PUBLIC SUMMARY OF THE DECISIONS TAKEN.
Minutes: RESOLVED that under Section 100(A) of the Local Government Act 1972, the public be excluded from the meeting during consideration of the following items of business on the grounds that they involve the likely disclosure of exempt information under paragraph 3 of Part 1 of Schedule 12A of the Act.
PART TWO – IN PRIVATE
THE FOLLOWING ITEMS OF BUSINESS WERE CONSIDERED IN PRIVATE BY THE CABINET. SET OUT BELOW IS A PUBLIC SUMMARY OF THE DECISIONS TAKEN.
|
|
Early Delivery of a Multi-Use Games Area as part of the long term proposal to expand Reigate Parish Church Infant School
This is a part 2 annex relating to item 9.
Exempt: Not for publication under Paragraph 3
Information relating to the financial or business affairs of any particular person (including the authority holding that information)
[The decisions on this item can be called in by either the Council Overview Board or the Education and Skills Board ]
Decision: 1. That the business case for the early delivery of a multi use games area as phase 1 of the proposed expansion of Reigate Parish Church Infant School from a 2 Form of Entry (180 places) infant school to a 2 Form of Entry (420 places) primary school, at a total estimated cost, as set out in the submitted report, be approved. 2. That the arrangements by which a variation of up to 10% of the total value may be agreed by the Strategic Director for Business Services, in consultation with the Cabinet Member for Schools, Skills and Educational Achievement, the Cabinet Member for Business Services and Resident Experience and the Leader of the Council be approved. Reasons for Decisions:
The proposal delivers and supports the Authority’s statutory obligation to provide sufficient school places to meet the needs of the population in the Reigate area.
[The decisions on this item can be called in by either the Council Overview Board or the Education & Skills Board]
Minutes: The Cabinet Member for Schools, Skills and Educational Achievement commended this report which contained the financial and value for money information relating to item 9. She said that this school was on a constrained site and that provision of a Multi-Use Games Area (MUGA) as phase 1 of this expansion project would replace an existing poor quality grass area.
RESOLVED:
1. That the business case for the early delivery of a multi use games area as phase 1 of the proposed expansion of Reigate Parish Church Infant School from a 2 Form of Entry (180 places) infant school to a 2 Form of Entry (420 places) primary school, at a total estimated cost, as set out in the submitted report, be approved. 2. That the arrangements by which a variation of up to 10% of the total value may be agreed by the Strategic Director for Business Services, in consultation with the Cabinet Member for Schools, Skills and Educational Achievement, the Cabinet Member for Business Services and Resident Experience and the Leader of the Council be approved. Reasons for Decisions:
The proposal delivers and supports the Authority’s statutory obligation to provide sufficient school places to meet the needs of the population in the Reigate area.
|
|
Award of Contract for the Managed Service for Temporary Labour Resources
This is a part 2 annex relating to item 10.
Exempt: Not for publication under Paragraph 3
Information relating to the financial or business affairs of any particular person (including the authority holding that information)
[The decisions on this item can be called in by the Council Overview Board]
Decision: That the contract be awarded to Adecco UK & Ireland for a period of four years to commence on 1 February 2016 and expire on 31 January 2020. The contract will also have the option to extend for a further two years. Reasons for Decision:
A contract is required to provide the supply of temporary resources to all service areas within the Council as part of the wider workforce planning and management. The current contract expires on 31 January 2016 and there is a continued need for this service. This tender exercise has been conducted in collaboration with East Sussex County Council to appoint a single supplier to provide the managed service across both Surrey County Council and East Sussex County Council.
[The decisions on this item can be called in by the Council Overview Board]
Minutes: The Cabinet Member for Business Services and Resident Experience said that this Part 2 report contained the financial and value for money information which related to item 10 and included the initial tender response scores and the shortlisted bidders for the final tender scores.
RESOLVED: That the contract be awarded to Adecco UK & Ireland for a period of four years to commence on 1 February 2016 and expire on 31 January 2020. The contract will also have the option to extend for a further two years. Reasons for Decision:
A contract is required to provide the supply of temporary resources to all service areas within the Council as part of the wider workforce planning and management. The current contract expires on 31 January 2016 and there is a continued need for this service. This tender exercise has been conducted in collaboration with East Sussex County Council to appoint a single supplier to provide the managed service across both Surrey County Council and East Sussex County Council. |
|
Investment in Improvements to the Visitor Facilities at Newlands Corner
This item has been withdrawn.
Decision: This item has been withdrawn. Minutes: This item has been withdrawn. |
|
PUBLICITY FOR PART 2 ITEMS
To consider whether the item considered under Part 2 of the agenda should be made available to the Press and public. Additional documents: Minutes: That non-exempt information relating to items considered in Part 2 of the meeting may be made available to the press and public, if appropriate.
|